Page
1 Page
2 Page
3 Page
4 Page
5 Page
6 Page
7 Page
8 Page
9
Page
10 Page
11 Page
12 Page
13 Page
14 Page
15 Page
16 Page
17 Page
18
Page
19 Page
20 Page
21 Page
22 Night
Driving (23) Making
Tires (24) Brass
Chassis (25)
Switching Scales (26) Routed
HO (27) Rails
Installed (28) Oval
Action (29)
New
1/32 Beginning (30) Construction
(31) Routing
(32) Painting
and Taping
(33) Power Taps
and Timing
(34)
Up and Running (35) Scenery
(36) More Slot
Racing (37)
Once you get to this stage you can really start to appreciate where you can
take your track in terms of scenery, etc. Seeing those wood slots is
enough to keep you going and you will also pick up this wierd desire
to thumb your nose at the plastic track sections and their limited imaginative
appeal.
Things to note on this page are the slapped together overpass supports (just add more nails/screws to make things sturdy), the clear plastic lexan strip that was used to do all but the overpass routing (its a flexible guide), and the bondo patches where I made a mistake on the routing.