Page
1 Page
2 Page
3 Page
4 Page
5 Page
6 Page
7 Page
8 Page
9 |
||
Another
day's work. Everything is routed. Only need to fix about four very
minor mistakes. Compared to my first track, this is working out
great! I lowered the overpass.
Brass screws hold the acrylic in place. I still need to add 5 matching bolts on the MDF side. A 3-inch wide piece of acrylic serves as the support on each end of the bridge. This was important in order to carry the look through once the paper is removed.
The lines on the MDF don't really show the true course I ended up routing. I have very few parts in this track that are parallel. Hopefully it all evens out once we are up and running.
|
Page
1 Page
2 Page
3 Page
4 Page
5 Page
6 Page
7 Page
8 Page
9
Page
10 Page
11 Page
12 Page
13 Page
14 Page
15 Page
16 Page
17 Page
18
Page
19 Page
20 Page
21 Page
22 Night
Driving (23) Making
Tires (24) Brass
Chassis (25)
Switching Scales (26) Routed
HO (27) Rails
Installed (28) Oval
Action (29)
New
1/32 Beginning (30) Construction
(31) Routing
(32) Painting
and Taping
(33) Power Taps
and Timing
(34)
Up and Running (35) Scenery
(36) More Slot
Racing (37)
Once you try it, you'll be hooked!
All Images Copyright Michael Nyberg
2009
All Rights Reserved
Visit: www.outriggercanoe.com